Turn results into decisionsLesson 50 of 76 · 8 min
Compare feasible options
Evaluate all choices under matched simulated conditions and explicit constraints.
A low expected loss does not automatically make an option feasible. A decision can include a service requirement, a spending limit or a physical bound in addition to an optimisation objective.
The code compares stock levels using the same simulated demand draws. A shortage occurs when demand exceeds stock. The example sets the shortage limit to 0.10 (10%). Of the tested levels at or below the limit, the code chooses the one with the lowest expected loss under the stated penalties.
A simulation estimate close to a constraint boundary has numerical uncertainty. Treat feasibility as unresolved when that uncertainty could reverse the decision, and do not turn an estimated probability into a guarantee. Model uncertainty can be larger still, especially when the future demand distribution was assumed.
Feasible means meeting the declared requirements. A point estimate is a single numerical estimate. Here feasibility uses each stock level’s estimated shortage probability.
- Evaluate matched worlds
- Identify feasible choices
- Rank feasible choices
Should an option with lower mean loss be accepted if it violates the declared service requirement?
Write a prediction (optional)
Seeded teaching simulation
Select Run Python below with the code unchanged.
A saved draft is open. To run the published example, open Tools and select Restore example. Recover draft brings your code back.
Execution error
Technical error details
Your result
Published example output
This result comes from the original Python. Your runs appear above. Build environment ↗
Shortage probability limit: 0.1
stock expected_loss shortage_probability meets_point_estimate_rule
25 24.0859 0.4471 False
28 16.5859 0.2411 False
32 16.5711 0.0721 True
36 22.4211 0.0145 True
Best feasible point-estimate choice: 32
Read the first result
Find shortage_probability and meets_point_estimate_rule in the table. Which stock levels meet the 10% limit, and which of those has the smallest estimated loss?
Try an edit
Replace max_shortage_probability = 0.10 with max_shortage_probability = 0.02. Select Run Python again. Which tested stock levels still have True in meets_point_estimate_rule? Then set the limit to 0.005 (0.5%) and select Run Python. Does any tested level meet the new limit?
Scope. The procedure compares a finite candidate list and uses estimated probabilities. It is not a proof of global optimality or guaranteed service.
Try a fresh case
A parcel service tests three delivery schedules. All three have an estimated late-delivery probability above the service limit. What should the report say?
Need a hint?
Hint 1
Apply the declared constraints before ranking feasible options.
Hint 2
Retain evidence when every candidate fails.